Power substation maintenance and construction
Flown by Bryan Overstreet, Agriculture & Natural Resources Educator, Purdue Extension – Jasper County
Purdue Extension partnered with Newton County REMC to photograph substation renovation and infrastructure to record how the temporary substation was hooked up to the distribution lines.
Structural Examples

The drone pilot used a thermal camera to check the functionality of the solar panel array...

A local, Jasper County school wanted flights to document infrastructure repairs supported by...

This video was collected to examine an aging grain system and assess what repairs or upgrades...

The construction footprint of two newly installed power transmission towers are shown here...

UAVs can serve as a quick method to detect anomalies in irrigation systems, such as this center...

Purdue Extension partnered with Newton County REMC to photograph substation renovation and...

A subsurface concrete drain pipe was installed in 2019 to provide an outlet from a new retention...

Before the installation of a new septic tank and finger system, this homeowner was curious about...

We were able to locate leaky windows on the second floor of this courthouse using a UAV. We found...